ShirLee McGarry's Homes4SaleUtah BLOG, features great articles for consumers, homeowners and Realtors® addressing community, local, state and national real estate news. Articles also include refreshing humor to encourage smiles and support for all real estate warriors in the trenches who do stand out to make a difference in their client's lives in the exciting and challenging world of the Realtor®. Penned by Associate Broker-Realtor®,and Registered Author, ShirLee McGarry® with RealtyPath in Sandy, Utah
Showing posts with label latest from UDOT. Show all posts
Showing posts with label latest from UDOT. Show all posts

Sunday, March 6, 2011

5400 South Flex Lanes Project Website

5400 SOUTH REDWOOD ROAD CFI

Part of the Redwood Road Intersection Improvement Project

Construction Update 3.7.11

5400 South Redwood Road CFI



Upcoming Scheduled Activities:

On 5400 South and Redwood Road:

Construction of the North-South Continuous Flow Intersection (CFI) at 5400 South and Redwood Road resumed on March 1. Crews will continue clearing and grubbing in preparation for utility re-location and installation on the NW corner of 5400 South and Redwood Road.

Sidewalk closures: Sidewalks will be closed on the northwest side of 5400 South, west of Redwood Road through mid-April. Pedestrians are reminded to stay out of the construction zone and use the sidewalks on the south side of 5400 South. 

Traffic Impacts:

Motorists and pedestrians should use care and watch for large trucks and heavy equipment entering and exiting the area. Intermittent lane closures may be required to accommodate construction vehicles.

Please slow down and pay attention when driving through the work zone.

Other Information:

When complete, these two projects at the intersections of 4700 South and 5400 South on Redwood Road will reduce traffic congestion and improve west/east traffic flow. Both intersections will be widened and improved with new curb, gutter, and sidewalk, as well as adjusted traffic signal timing.

* The intersection of 5400 South and Redwood Road will be converted into a new North-South CFI. (See illustration below)
* Dual left and single right-turn lanes will be added to all sides of the intersection of 4700 South and Redwood Road.

Construction at both projects is anticipated to be complete by early fall.





5400 South & Redwood Road Continuous Flow Intersection (CFI)
Useful links
Redwood Road, 4700 South widening and 5400 South CFI Project Website

5400 South Flex Lanes Project Website

Contact the Public Information Team

Toll free hotline: 1-888-556-0232

Email: 47-54redwood@utah.gov

Visit the Redwood Road Intersections project at www.udot.utah.gov/go/47-54redwood or click on "Useful links" for additional information.

Activities are subject to change due to weather, supply, or equipment problems

Friday, October 29, 2010

Latest Information on 5400 South Flex Lanes and Bangerter Highway CFI at 5400 South

5400 South Flex Lanes

On Sun., Oct. 31, 7 a.m. to 7 p.m., 5400 South between Redwood Road and Bangerter Highway will be down to one lane in each direction. Crews will remove the Flex Lanes striping until the new system goes into operation spring 2011. Left turns will be prohibited at all intersections, side streets and driveways.


5400 South and Bangerter Hwy CFI

The CFI at 5400 South and Bangerter Highway is now in operation. Please be aware of the changes to the intersection and remember that right turns onto Bangerter Highway during a red light are prohibited. To view the CFI simulation video, please visit www.udot.utah.gov/wego. 

I had a driver honking his horn like a maniac yesterday because I wouldn't turn right on the red light. Well guess what, if you do you will be crashing into cars turning left (west) off of Bangerter head on so pay attention!!!!!

This schedule is subject to change due to bad weather or other unforeseen circumstances.

WE GO! Public Information Team
wego2010@gmail.com
1-877-550-WEGO (9346)